The U.S. Coast Guard Cutter Chase, a 378-ft ship, will prepare to deploy on January 14, 2003.
The deployment training consists of man overboard drills, fire fighting drills and damage control drills all while moored at Naval Station San Diego. This drill will take place between 5 a.m. and 9 a.m.
Related News
11 Jun 2026
NEPTUN WERFT Delivers Two River Cruise Ships to Viking
In Basel today, June 11, 2026, NEPTUN WERFT officially delivered the river cruise ships Viking Annar and Viking Fjolvar to Viking.
11 Jun 2026
VARD inks deal to Build Fishing Vessel for Rosund
VARD, the Norwegian shipbuilding subsidiary of Fincantieri, won a contract to design and build an advanced fishery vessel…
11 Jun 2026
Three Indian Sailors Die After US Strike Tanker off Oman
All three missing Indian seafarers have died after a U.S. military strike on a tanker in the Gulf of Oman, Indian Shipping…
11 Jun 2026
Hormuz Reopening Could Trigger OPEC’s Next Big Challenge
Saudi Arabia and neighbouring Gulf producers will cheer the eventual reopening of the Strait of Hormuz, but the ensuing flood…